Customer Stories

Trimble Construction-case-study-EMEA-willmott-dixon-2021

Issue link: https://www.viewpoint.com/resource-library/i/1252948

Contents of this Issue

Navigation

Page 1 of 12

©2021 Viewpoint, Inc. All Rights Reserved. Willmott Dixon reduces costs, saves time with Trimble Viewpoint Solutions. Founded in 1852, Willmott Dixon is a privately-owned contracting and interior fit-out group. The organisation is recognised as one of the top construction contractors in the UK and, as such, were awarded the delivery of the National College for High Speed Rail (NCHSR) project. The project duration was 15 months and was valued at £21.2m, comprising more than 71,720m² of teaching and workshop space. The complexity of the project required a system that brought all the various groups together to work from a common data environment, allowing Willmott Dixon to surface and address challenges early and often. 2

Articles in this issue

view archives of Customer Stories - Trimble Construction-case-study-EMEA-willmott-dixon-2021